How does the road marking machine work?


Road markings are also called road markings, that is, lines, arrows, signs, etc. which we can see on the road every day to identify traffic information, and play a role in traffic control and guidance. Next, the editor will take you to understand how road marking is constructed and what should be paid attention to during construction.

Road markings are also called road markings, that is, lines, arrows, signs, etc. which we can see on the road every day to identify traffic information, and play a role in traffic control and guidance. Next, the editor will take you to understand how road marking is constructed and what should be paid attention to during construction.

The road marking construction personnel can be divided into three groups, the road cleaning defense line group, the paint melting and mixing group, and the signaling coating group. The construction temperature for road marking is generally 100°C to 300°C. If the ambient temperature is less than 100°C, construction cannot be carried out and the road surface must be dry and free of dust during the construction process.
How should road signs be built and what aspects should be paid attention to?
1. Road cleaning and staking group: First use a manual road cleaning machine to clean the road area, dust and floating obstacles, dust, asphalt, oil or other harmful substances, and mark the wires as necessary.
2. Coating melting and stirring group: put the coating (auxiliary) into the hot melt, control the temperature in the kettle between 180°C and 210°C, stir while melting, and strictly control the temperature. After fusion and dispersion, to ensure better marking quality, inspections and tests are carried out. The inspection method is to take a small sample of the paint into the kettle, paint it on a sheet (thickness about 1.6mm), let it cool naturally, bend it with your fingers after a thousand bursts, and the stain will break when It is bent at about 35 degrees
Marking coating group: When the paint melted in the hot melt kettle is placed into the marking storage tank, it should be filtered with an iron screen. Build the heat under the barrel and next to the tracer to maintain proper application temperature. Then pour the glass beads into the box and construction can begin. When marking the line, the marking machine is applied according to the wire and the suitable coating temperature is about 180°C.